Completed Projects
DSI AYDIN- Concrete Pool Cooling Project
We have successfully commissioned a 32 kW air-cooled chiller at the DSI Aydın 21st Regional Directorate.
The system is designed to control the water temperature of the concrete sample pool in the laboratory department and includes a sand filter, sand filter pump, scroll compressor, and a tube & shell evaporator.
Proud to contribute to this project.
November 2025


Bandırma RES-Wind Energy Turbine Concrete Cooling Project
The project to cool the foundation concrete of the Wind Turbine to be installed at Enerjisa Bandırma Energy Base has been successfully completed.
July 2025


Contact
Evanso Factory:
Atatürk Sanayi Sitesi
Yedi Eylül Mahallesi 5544 Sk. No:46 Torbalı İzmir
